West Park New Elementary School

A brand new replacement elementary school located where the old elementary was. A precast/ steel structure with non-load bearing CMU partitions. 

 

The masonry consists of 50,000 non-load bearing lightweight CMU as brick veneer and cast stone. The masonry work is to start September 2019 and be completed early 2020. JE Dunn Construction is the design-build contractor and the design firm is HTK Architects. 